Johor Industrial Land Price 2026: Price per Sq Ft by Area

Aerial view of cleared industrial land plots for sale in Johor, with factories and a data centre campus in the background

Most industrial land in Johor is offered at about RM40 to RM100 per sq ft in October 2026. Smaller freehold lots near Senai, Seelong and Tanjung Langsat sit around RM50 to RM90 per sq ft. Large rural parcels in Pekan Nanas and Pontian are lower, at about RM30 to RM45. Land approved for data centres is in a different bracket: recent deals in Johor have been done at about RM110 to RM200 per sq ft.

This guide sets out asking prices by area, recent land deals reported to Bursa Malaysia, what pushes a price up or down, and the costs to add on top. Prices are as of October 2026; the final price always depends on the lot, the title and the negotiation.

Industrial land prices by area

The table below uses the asking prices of freehold industrial land listed on this website in October 2026. Price per sq ft is the asking price divided by the land area.

AreaLot sizes listedAsking price per sq ft
Seelong and Senai2 to 8 acres; one 160-acre parcelRM50 to RM75
Ulu TiramAbout 5 acresAbout RM47
Tanjung Langsat (industrial)21 to 22 acresRM80 to RM88
Gelang Patah, Tanjung Pelepas and Forest City2.6 to 18 acresRM60 to RM125
Pekan Nanas and Pontian10 to 414 acresRM28 to RM45
Data centre land (Nusajaya, Sedenak, Kulai, Tanjung Langsat)20 to 150 acresRM130 to RM180
Asking prices of freehold land listed on topjohorfactory.com, October 2026.

A few examples behind these numbers: a 6-acre lot in Seelong at about RM75 per sq ft, 22 acres in Tanjung Langsat at about RM80, 11 acres near the Port of Tanjung Pelepas at about RM125, and 10 acres in Pekan Nanas at about RM45. Asking prices are where talks start, not where they end.

Recent industrial land deals in Johor

Listed companies must announce large land sales to Bursa Malaysia, so these deals show what buyers have actually agreed to pay. Price per sq ft is our own calculation from the reported price and land area.

DateLocationLand areaPricePer sq ftBuyer
Jun 2026Johor Bahru (two parcels)2.8 million sq ftRM398.1 millionAbout RM142DayOne (data centre)
May 2026SiLC, Iskandar Puteri12,689 sq m (about 3.1 acres)RM27.32 millionAbout RM200Heptagon Photonics
Apr 2026Bandar Cemerlang, Kota Tinggi district20.12 hectares (about 50 acres)RM346.53 millionAbout RM160Digital Edge (data centre)
Dec 2025Tanjung Kupang, Gerbang Nusajaya5.45 hectares (about 13.5 acres)RM64.47 millionAbout RM110GSP Automotive
Nov 2025KulaiAbout 941.8 acresRM814.78 millionAbout RM20EcoWorld-led joint venture
Apr 2024Pulai, Iskandar Puteri1.1 million sq ftRM132.47 millionRM120Microsoft
Sources: The Star, New Straits Times, EdgeProp and Business Today reports of Bursa Malaysia filings (links below).

Two things stand out. First, most of the high prices come from data centre operators, who pay for power and location rather than for the land itself. Second, the Kulai deal at about RM20 per sq ft is a very large parcel bought for a new industrial park; the buyer still has to pay for roads, drains, power and water before any lot can be sold, so it is not a guide for a buyer of a single lot.

Sources: The Star, June 2026; The Star, May 2026; New Straits Times, April 2026; EdgeProp, December 2025; Business Today, November 2025; EdgeProp, April 2024.

Why data centre land costs more

A data centre needs a large, flat site, a confirmed power supply from TNB, water and fibre. Land that already has approval for data centre use and a credible power plan is scarce, so operators pay a premium for it. That is why land in the same district can sell at RM60 per sq ft for a factory and RM150 or more for a data centre. If you are comparing data centre sites, ask for the power allocation in writing; read more in our guides to data centre land in Johor and data centres in Gelang Patah and Nusajaya.

What pushes the price up or down

  • Lot size. Bigger parcels usually cost less per sq ft. A 2-acre lot can ask more per sq ft than a 100-acre block in the same area.
  • Land use on the title. Heavy and medium industry, or approval for data centre use, is worth more than light industry. Agricultural land needs conversion, which takes time and a premium to the state.
  • Tenure. Freehold is worth more than leasehold. Much of the older land in Tanjung Langsat, for example, is leasehold.
  • Power and utilities. Land with an existing substation nearby, or a TNB letter for the load you need, sells faster and at a higher price.
  • Access. Distance to the North–South Expressway, the Second Link, the ports and Senai Airport matters, especially for logistics.
  • Bumiputera lots and restrictions. Some titles can only be sold to Bumiputera buyers or need state consent to transfer, which narrows the pool of buyers and can lower the price.

How to work out price per sq ft

One acre is 43,560 sq ft. Divide the price by the land area in sq ft:

Price per sq ft = price ÷ (acres × 43,560)

Example: a 5-acre lot at RM12 million is RM12,000,000 ÷ 217,800 sq ft = about RM55 per sq ft. For land in hectares, one hectare is about 107,639 sq ft.

Costs to add on top of the land price

  • Stamp duty on the transfer. For a Malaysian buyer it is on a sliding scale up to 4%. Foreign buyers of industrial property pay 4%.
  • State approval levy for foreign buyers in Johor, which is 4% of the price or valuation for industrial property from 1 July 2025.
  • Legal fees for the sale and purchase agreement and the loan.
  • Conversion or development costs if the land is not yet zoned for your use, or has no roads, drains or power connection.

For the full buying steps, deposits and timelines, see how to buy a factory in Johor.

Industrial land for sale in Johor

See all current lots on our industrial land for sale in Johor page, including data centre land in Tanjung Langsat, freehold land near Forest City and 160 acres in Senai. If you are still choosing an area, our guide to Johor industrial parks compares more than 20 parks.

👉 Tell Jimmy the size, area and use you need, and he will send you land that fits your budget, usually within the day.